Pioneering Mission

RUDRA-R1 Reusable Rocket

Formerly known as Kalpana-1

India's first fully reusable launch vehicle, pioneering sustainable space exploration and reducing launch costs by up to 70%

67
Researchers
20kg
Payload to LEO
32%
Cost Reduction
2027
First Launch
RUDRA-R1 Reusable Rocket

Latest News

Rocket Testing
September 2, 2025

RUDRA-R1 Program Announcement on 1 September 2025

Talisha Aerospace Announcement The Reusable Rocket Mission of Kalpana Series Rocket

Read More News
Team Photo
October 2, 2025

Talisha Technical Team Hiring For RUDRA-R1 Rocket Mission

Technical opportunities for engineers, researchers and specialists working in space technology and AI

Read More News

About RUDRA-R1 Mission

RUDRA-R1 (formerly Kalpana-1) is a reusable rocket and India’s first reusable rocket developed by the dedicated researchers of Talisha Space Research Organization. It is supported by sponsorships and investments that help bring this revolutionary project to life.

This mission is powered by the collaboration of top young minds and highly experienced researchers, proving that the youth of India are the true future of innovation and technology.

The mission is highly secure, and therefore, limited technical data is available publicly. Please visit the “About” section for more detailed information about this project.

Technical Specifications
Rocket Technology

Technical Test Timeline

December 2025

Prototype Ground Testing

Initial technical verification of the RUDRA-R1 prototype, including structural checks, ground systems and control-system validation.

January – February 2026

Avionics & Control System Tests

Bench-level validation of avionics, flight-computer interfaces, sensors, telemetry and guidance, navigation and control subsystems.

March – April 2026

Propulsion Subsystem Testing

Controlled ground testing and verification of propulsion-system performance, instrumentation and subsystem interfaces.

May – July 2026

Integrated Static Ground Tests

Progressive integration tests for propulsion, avionics, control, telemetry and ground-support systems under controlled test conditions.

August – September 2026

Flight Computer & Telemetry Validation

End-to-end verification of flight software interfaces, telemetry links, sensor data acquisition and command-response performance.

October – December 2026

Structural & Environmental Qualification Tests

Technical qualification of vehicle structures, interfaces and selected components through controlled environmental and load testing.

January – February 2027

Integrated Vehicle Testing

Final integrated ground verification of major vehicle subsystems, test instrumentation, flight software and mission-control interfaces.

March 2027

Final Testing Phase

Final technical test campaign, verification of mission-critical systems and closure of identified test findings before mission readiness.

April 2027

Mission Readiness & Final Technical Verification

Final readiness checks, configuration verification, ground-support validation and completion of the approved technical test program.

May 2027

Mission Completion

Completion of the planned RUDRA-R1 technical development and testing milestone, subject to successful verification and mission-readiness criteria.

Project Timeline

Technical development and testing schedule for RUDRA-R1 (formerly Kalpana-1). This timeline lists technical milestones only.

SL.No Technical Milestone Date
1 Prototype Ground Testing December 2025
2 Avionics & Control System Tests January – February 2026
3 Propulsion Subsystem Testing March – April 2026
4 Integrated Static Ground Tests May – July 2026
5 Flight Computer & Telemetry Validation August – September 2026
6 Structural & Environmental Qualification Tests October – December 2026
7 Integrated Vehicle Testing January – February 2027
8 Final Testing Phase March 2027
9 Mission Readiness & Final Technical Verification April 2027
10 Mission Completion May 2027

Opportunities

Join us in revolutionizing space access. We offer various opportunities for individuals and organizations to participate in the RUDRA-R1 mission.

Join Our Team

We're looking for passionate individuals to join our mission. Current openings include:

  • Aerospace Engineers
  • Propulsion Specialists
  • Avionics Engineers
  • Software Developers
  • Materials Scientists
  • Mission Operations Specialists
View Open Positions

Research Collaboration

We collaborate with academic institutions and research organizations on cutting-edge space technologies.

  • Reusable rocket technology
  • Advanced materials for space applications
  • Propulsion system optimization
  • Autonomous landing systems
  • Space debris mitigation
Propose Collaboration

Investment Opportunities

Invest in the future of space technology and be part of India's growing private space sector.

  • Equity investment in Talisha Aerospace
  • Project-specific funding
  • Technology development partnerships
  • Joint venture opportunities
  • Government contract collaborations
Learn About Investment

Frequently Asked Questions

What makes Kalpana-1 different from other rockets?

RUDRA-R1 is a fully reusable orbital rocket, designed to land back on Earth after delivering its payload to orbit. This reusability dramatically reduces launch costs and increases access to space. Unlike traditional rockets that are discarded after a single use, RUDRA-R1 can be rapidly refurbished and relaunched, making space more accessible and sustainable.

How many times can RUDRA-R1 be reused?

Our current design targets at least 10 reuses without major refurbishment, with a goal of eventually achieving 100+ reuses with minimal maintenance between flights. Each component is designed with longevity in mind, using advanced materials and engineering to withstand the rigors of multiple launches and landings.

What payload capacity does RUDRA-R1 have?

Kalpana-1 is designed to deliver up to 32 kg to low Earth orbit (LEO). This capacity makes it suitable for a wide range of missions including satellite deployments, space station resupply, and scientific payloads.

When will RUDRA-R1 be available for commercial launches?

We plan to begin commercial operations in late 2027, following the successful completion of our testing program in March 2027. We are already accepting expressions of interest from potential customers for launch slots in our initial operational year.

Contact Us

Have questions about the RUDRA-R1 mission? Get in touch with our team.

Mission Director

Mr. Utsav Chakraborty

utsav.chakraborty2005@outlook.com

+91 9734454046/+91 9064089085

Cordinator

Karan

priya.patel@talishaaerospace.com

+91 98765 43211

Management Department

Talisha Aerospace

talishaaerospace@gmail.com

+91 8001087752